Post-construction cleaning checklist

Updated 26 November 2026

Everything to check, room by room, before moving in, renting out or handing over a property after building work

A successful post-construction clean is judged on the details: the inside of a cupboard, the top of a door, the track of a window. This list helps you organise the clean yourself, or check the work before moving in, renting out or handing over a property.

Before you start

  • The work is really finished: no last paint touch-up planned.
  • Rubbish and rubble have been removed.
  • Water and electricity are working.
  • Protective films are still in place on fragile surfaces, or removed just before cleaning.
  • The order is clear: from top to bottom, with the floor last.

Living rooms and bedrooms

  • Ceilings, cornices and light fittings dusted.
  • Walls, switches and power sockets wiped.
  • Skirting boards, doors, handles and tops of doors cleaned.
  • Cupboards and wardrobes cleaned inside and out, shelves included.
  • Air conditioners: grilles and filters dusted before first use.
  • Floors vacuumed, then washed with a product suited to the surface.

Kitchen

  • Cupboards and drawers cleaned inside and out.
  • Worktop and splashback cleared of glue, grout and silicone marks.
  • New appliances: stickers, films and dust removed, inside of the oven and fridge wiped.
  • Extractor hood and vents dusted.
  • Sink and taps descaled and shiny.

Bathrooms

  • Toilets, basins, shower and bath cleaned, mortar and silicone marks removed.
  • Wall tiles and grout cleared of cement haze.
  • Taps and shower head free of limescale and glue.
  • Mirrors and shower screens streak-free.
  • Bathroom furniture cleaned inside and out.

Windows and joinery

  • Windows cleaned on both sides, without scratches: see windows after building work.
  • Stickers and protective films removed.
  • Tracks and frames vacuumed, free of sand and grit.
  • Shutters and fly screens dusted.

Outside

  • Terraces and balconies swept and washed.
  • Railings and balustrades wiped.
  • Cement and paint marks removed from thresholds and steps.

The final check

  • Look against the light at floors and windows: that is where films and streaks show.
  • Open every cupboard and every drawer.
  • Run your hand along the tops of doors and skirting boards.
  • Ventilate and come back one or two days later: fine dust still in the air may have settled. See removing building dust.

Leaving the list to a team

Our post-construction cleaning covers most of this list: cement and plaster dust, ceilings, walls and skirting boards, switches and sockets, windows and joinery, floors, bathrooms and taps, stickers and protective films, and removal of clean building waste. The price depends on the area and the state of the site; the quote is free, from a detailed video of the site or after a visit, within 24 hours. See our post-construction cleaning service and our guide on timing and price.

Need a hand? Send us photos on WhatsApp: free quote within 30 minutes, no obligation. See our service and our prices.

Request a post-construction quote
WhatsApp